Durbin Geothermal offers several excavating methods for your horizontal
loop field. We have encountered many different soil and site conditions,
and are confident we can offer an effective solution for your loop field
needs. The chart below shows the available options and space needed for
installation of each.
Open Cut Trench Options
Chain Trencher
Width | 6-8 ft |
---|
Depth | 4 ft out, 6 ft back |
---|
Length | 250 ft |
---|
Tons per Trench | 1 |
---|
Distance Between | 8-10 ft |
---|
500 ft coils are used with trenchers |
Excavator
Width | Depth | Length | Tons per Trench | Distance Between |
---|
30 in | 4 ft out, 6 ft back | 300 ft | 2 | 10-12 ft |
30 in | 4 ft out, 6 ft back | 150 ft | 1 | 10-12 ft |
54 in Slinky | 5 ft | 150 ft | 1 | 12 ft minimum |
600 ft coils are used with excavators |
Directional Boring is also available.